Autoplay
Show Thumbnails
Show Captions
LINKEDINCOMMENTMORE

This visual timeline shows in the construction steps for replacing the southern mile of the Alaskan Way Viaduct between summer 2010 and the end of 2013.

The project aims to connect to any future replace of the viaduct between South King Street and Battery Street. These images show where traffic will be located during each step.

CLICK HERE TO VIEW SLIDE SHOW

(The construction steps and scheduled dates shown are subject to change.)

Read or Share this story: http://www.king5.com/story/news/local/2014/08/02/13027046/